Lion Brand® Holiday Homespun Knit Winter Mix Stocking Hat
Designed by Lion Brand, LB# 90169AD
Material List
- Holiday Homespun Yarn: Holly
- Holiday Homespun Yarn: Berry
- Holiday Homespun Yarn: Starlight
- Lion Brand Double-Pointed Needles - Size 10
- Lion Brand Stitch Markers
- Pom Pom Maker
- Large-Eye Blunt Needles (Set of 6)
Project Instructions
Step: 1
GAUGE:
Step: 2
13 sts = 4 in. (10 cm) in St st worked in the rnd (k every rnd). BE SURE TO CHECK YOUR GAUGE. When you match the gauge in a pattern, your project will be the size specified in the pattern and the materials specified in the pattern will be sufficient. If it takes you fewer stitches and rows to make a 4 in. [10 cm] square, try using a smaller size hook or needles; if more stitches and rows, try a larger size hook or needles.
Step: 3
STITCH EXPLANATION:
Step: 4
K1, p1 Rib (worked in the rnd)
Step: 5
Rnd 1: *K1, p1; rep from * around.
Step: 6
Rnd 2: K the knit sts and p the purl sts.
Step: 7
Rep Rnd 2 for K1, p1 Rib.
Step: 8
CAP
Step: 9
With A, cast on 60 sts. Divide sts onto 4 needles and join, being careful not to twist. Place marker for beginning of rnd.
Step: 10
Work in K1, p1 Rib for 3 rnds.
Step: 11
Change to B and St st worked in the rnd (k every rnd).
Step: 12
With B, knit 6 rnds.
Step: 13
With C, knit 1 rnd.
Step: 14
With A, knit 2 rnds.
Step: 15
With B, knit 4 rnds.
Step: 16
With C, knit 2 rnds.
Step: 17
With B, knit 2 rnds.
Step: 18
With A, knit 6 rnds.
Step: 19
With C, knit 1 rnd.
Step: 20
With B, knit 4 rnds.
Step: 21
With C, knit 2 rnds.
Step: 22
With B, knit 2 rnds.
Step: 23
Next (Dec) Rnd: With A, *k8, place marker, k2tog, rep from * around - 54 sts at end of rnd.
Step: 24
With A, knit 3 rnds.
Step: 25
With C, knit 1 rnd.
Step: 26
With B, knit 4 rnds.
Step: 27
Next (Dec) Rnd: With B, *k to marker, slip marker, k2tog, rep from * around - 48 sts at end of rnd.
Step: 28
Continue to repeat stripes as established OR work random stripes as desired, AT THE SAME TIME, rep Dec Rnd every 8 rnds 6 more times - 12 sts remain.
Step: 29
Knit 15 rnds.
Step: 30
Next Rnd: K2tog around - 6 sts.
Step: 31
Cut yarn, leaving a long tail. Thread tail through remaining sts and gather tightly together.
Step: 32
FINISHING
Step: 33
With C and following package directions, make a pompom. Tie pompom to Cap. Weave in ends.
Tips
Use photo as a guide and follow manufacturer’s instructions for all products used.
