Patons Classic Wool Knit Armwarmers and Mittens
Add to Favorites Print

Patons Classic Wool Knit Armwarmers and Mittens

Gorgeously cabled armwarmer and mittens set. Designed Patons
Craft Time: varies
 
 
 
 
Get exclusive offers about this product and more!
 
 

Material List

  • Patons® Classic Wool-
  • ArmWarmers
  • Sizes S-M-L
  • (Aran) 3-3-3 Balls
  • Mittens
  • (Aran) 1 Ball
  • Knitting Needles- Sizes 4 mm (U.S. 6) and 4.5 mm (U.S. 8)
  • Set of 4 Double Pointed Knitting Needles- Sizes 4 mm (U.S. 6) and 4.5 mm (U.S. 7)
  • Cable Needle
 

Project Instructions

Step: 1

SIZES


Step: 2

ARM WARMER


Step: 3

To fit upper arm circumference:


Step: 4

Small 12 ins [ 30.5 cm ]


Step: 5

Medium 15 ins [ 38 cm ]


Step: 6

Large 18 ins [ 45.5 cm ]


Step: 7

MITTENS


Step: 8

One size to fit average lady’s hand.


Step: 9

TENSION


Step: 10

20 sts and 26 rows = 4 ins [10 cm] with larger needles in stocking st.


Step: 11

STITCH GLOSSARY


Step: 12

C2B = Knit into front of 2nd stitch on left hand needle, then knit 1st stitch, slipping both sts off needle.


Step: 13

C2F = Knit into back of 2nd stitch on left hand needle, then knit 1st stitch, slipping both sts off needle.


Step: 14

C4F = Slip next 2 stitches onto cable needle and leave at front of work. K2, then K2 from cable needle.


Step: 15

C4B = Slip next 2 stitches onto cable needle and leave at back of work. K2, then K2 from cable needle.


Step: 16

C6F = Slip next 3 stitches onto cable needle and leave at front of work. K3, then K3 from cable needle.


Step: 17

C6B = Slip next 3 stitches onto cable needle and leave at back of work. K3, then K3 from cable needle.


Step: 18

C7B = Slip next 4 stitches onto cable needle and leave at back of work. K3, then K4 from cable needle.


Step: 19

KB1 = Knit into back loop of next stitch.


Step: 20

M1 = Make 1 st by picking up horizontal loop lying before next stitch and knitting into back of loop.


Step: 21

T4F = Slip next 3 stitches onto cable needle and leave at front of work. P1, then K3 from cable needle.


Step: 22

T4B = Slip next stitch onto cable needle and leave at back of work. K3, then P1 from cable needle.


Step: 23

INSTRUCTIONS


Step: 24

The instructions are written for smallest size. If changes are necessary for larger sizes the instructions will be written thus ( ).


Step: 25

Panel Pat A (worked over 10 sts).


Step: 26

1st row: (RS). P2. C6B. P2.


Step: 27

2nd and alt rows: Knit all knit sts and purl all purl sts as they appear.


Step: 28

3rd, 5th and 7th rows: P2. K6. P2.


Step: 29

8th row: As 2nd row.


Step: 30

These 8 rows form Panel Pat A.


Step: 31

Panel Pat B (worked over 10 sts).


Step: 32

1st row: (RS). P2. C6F. P2.


Step: 33

2nd and alt rows: Knit all knit sts and purl all purl sts as they appear.


Step: 34

3rd, 5th and 7th rows: P2. K6. P2.


Step: 35

8th row: As 2nd row.


Step: 36

These 8 rows form Panel Pat B.


Step: 37

Panel Pat C (worked over 21 sts).


Step: 38

1st row: (RS). P7. K7. P7.


Step: 39

2nd and alt rows: Knit all knit sts and purl all purl sts as they appear.


Step: 40

3rd row: P7. C7B. P7.


Step: 41

5th row: P6. T4B. KB1. T4F. P6.


Step: 42

7th row: P5. C4B. P1. KB1. P1. C4F. P5.


Step: 43

9th row: P4. T4B. KB1. (P1. KB1) twice. T4F. P4.


Step: 44

11th row: P3. C4B. P1. (KB1. P1) 3 times. C4F. P3.


Step: 45

13th row: P2. T4B. KB1. (P1. KB1) 4 times. T4F. P2.


Step: 46

15th row: P2. K3. P1. (KB1. P1) 5 times. K3. P2.


Step: 47

17th row: As 15th row.


Step: 48

19th row: P2. T4F. KB1. (P1. KB1) 4 times. T4B. P2.


Step: 49

21st row: P3. T4F. P1. (KB1. P1) 3 times. T4B. P3.


Step: 50

23rd row: P4. T4F. KB1. (P1. KB1) twice. T4B. P4.


Step: 51

25th row: P5. T4F. P1. KB1. P1. T4B. P5.


Step: 52

27th row: P6. T4F. KB1. T4B. P6.


Step: 53

29th row: As 3rd row.


Step: 54

31st row: As 1st row.


Step: 55

32nd row: As 2nd row.


Step: 56

These 32 rows form Panel Pat C.


Step: 57

Panel Pat D (worked over 6 sts).


Step: 58

1st row: (RS). C6B.


Step: 59

2nd and alt rows: P6.


Step: 60

3rd and 5th rows: K6.


Step: 61

6th row: As 2nd row.


Step: 62

These 6 rows form Panel Pat D.


Step: 63

Panel Pat E (worked over 16 sts).


Step: 64

1st row: (RS). P2. C6B. C6F. P2.


Step: 65

2nd and alt rows: Knit all knit sts and purl all purl sts as they appear.


Step: 75

3rd, 5th and 7th rows: P2. K6. P2.


Step: 76

8th row: As 2nd row.


Step: 66

These 8 rows form Panel Pat E.


Step: 67

ARM WARMERS (make 2).


Step: 68

With smaller needles, cast on 59 (75-91) sts.


Step: 80

1st row: (RS). K1. *P1. K1. Rep from * to end of row.


Step: 81

2nd row: P1. *K1. P1. Rep from * to end of row.


Step: 82

Rep last 2 rows for (K1. P1) ribbing for 3 ins [7.5 cm], ending with WS facing for next row.


Step: 83

Next row: (Increase row). Rib 13 (21- 29) sts. (M1. Rib 4 sts) 8 times. Rib to end of row. 67 (83-99) sts.


Step: 84

Change to larger needles and proceed as follows:


Step: 85

1st row: (RS). Rib 11 (19-27) sts. Work 1st row of Panel Pat A. C2B. Work 1st row of Panel Pat C. C2F. Work 1st row of Panel Pat B. Rib to end of row.


Step: 86

2nd row: Knit all knit sts and purl all purl sts as they appear.


Step: 87

3rd row: Rib 11 (19-27) sts. Work 3rd row of Panel Pat A. C2B. Work 3rd row of Panel Pat C. C2F. Work 3rd row of Panel Pat B. Rib to end of row.


Step: 88

4th row: As 2nd row.


Step: 89

Panel Pats A, B and C are now in position. These 4 rows form pat.


Step: 90

Cont even in pat until 2 reps of Panel Pat C have been completed, ending with 1st row of Panel Pat C.


Step: 91

Proceed as follows:


Step: 92

1st row: (WS). Pat 30 (38-46) sts. P3. P2tog. P2. Pat to end of row. 66 (82-98) sts.


Step: 93

2nd row: Pat 30 (38-46) sts. Work 1st row of Panel Pat D. Pat to end of row.


Step: 94

3rd row: Knit all knit sts and purl all purl sts as they appear.


Step: 95

4th row: Pat 30 (38-46) sts. Work 3rd row of Panel Pat D. Pat to end of row.


Step: 96

5th row: Knit all knit sts and purl all purl sts as they appear. Panel Pats A, B and D are now in position.


Step: 97

6th row: Pat to 3 sts before Panel Pat D. P2tog. P1. Work appropriate row of Panel Pat D. P1. P2tog. Pat to end of row. 64 (80-96) sts.


Step: 98

Work 3 (3-1) row(s) even.


Step: 99

Rep last 6 (6-4) rows 6 times more. 52 (68-84) sts.


Step: 100

Sizes M and L only: Next row: Rib (19-27) sts. Work Panel Pat A across 8 sts. P2tog. C2B. Work Panel Pat D across 6 sts. C2F. P2tog. Work Panel Pat B across 8 sts. Rib to end of row. (66-82) sts.


Step: 101

Work (5-1) row(s) even.


Step: 102

Next row: Rib (19-27) sts. P2tog. Panel Pat A across 7 sts. P1. C2B. Work Panel Pat D. C2F. P1. Work Panel Pat B across 7 sts. P2tog. Rib to end of row. (64-80) sts.


Step: 103

Change to smaller needles and proceed as follows:


Step: 104

All sizes: Next row: (RS). (Buttonhole row). Pat across 25 (31-39) sts. Cast off 2 sts. Pat to end of row.


Step: 105

Next row: (P1. K1) 12 (15-19) times. P1. Cast on 1 st. Rib to end of row. Work in (K1. P1) ribbing for next 4 rows. Cast off in rib. 51 (63-79) sts.


Step: 106

MITTENS


Step: 107

RIGHT MITTEN


Step: 108

**With set of 4 double pointed smaller needles, cast on 36 sts. Divide sts onto 3 needles (12 sts on each needle). Join in rnd. Place marker on first st.


Step: 109

1st rnd: (RS). *K1. P1. Rep from * around.


Step: 110

Rep last rnd of (K1. P1) ribbing for 2½ ins [6 cm].**


Step: 111

Change to larger needles and proceed as follows:


Step: 112

1st rnd: K7. (M1. K1) 4 times. Knit to end of rnd. 40 sts.


Step: 113

2nd rnd: K5. Work 1st row in Panel Pat E. Knit to end of rnd.


Step: 114

Panel Pat E is now in position.


Step: 115

Work in pat for 7 rnds more.


Step: 116

Shape thumb gusset: 1st rnd: Pat 22 sts. Inc 1 st in each of next 2 sts. Knit to end of rnd.


Step: 117

2nd and alt rnds: Work even in pat.


Step: 118

3rd rnd: Pat 22 sts. Inc 1 st in next st. K2. Inc 1 st in next st. Knit to end of rnd.


Step: 119

5th rnd: Pat 22 sts. Inc 1 st in next st. K4. Inc 1 st in next st. Knit to end of rnd.


Step: 120

Cont in same manner, inc 2 sts on every following alt rnd to 50 sts.


Step: 121

Next rnd: Pat 22 sts. Cast on 2 sts. Slip next 12 sts onto safety pin (thumb opening). Knit to end of rnd.


Step: 122

***Pat in rnds even until work after Ribbing measures 6 ins [15 cm].


Step: 123

Shape Top: Keeping cont of pat, proceed as follows:


Step: 124

1st rnd: Sl1. K1. psso. Pat 18 sts. K2tog. Sl1. K1. psso. K14. K2tog.


Step: 125

2nd and alt rnds: Work even in pat.


Step: 126

3rd rnd: Sl1. K1. psso. Pat 16 sts. K2tog. Sl1. K1. psso. K12. K2tog.


Step: 127

5th rnd: Sl1. K1. psso. Pat 14 sts. K2tog. Sl1. K1. psso. K10. K2tog.


Step: 128

Cont in same manner, dec 4 sts on every following alt rnd, to 24 sts.


Step: 129

Next rnd: Sl1. K1. psso. K1. (K2tog) 4 times. K1. K2tog. Sl1. K1. psso. K6. K2tog. 20 sts. Rearrange 10 sts on each of 2 needles. Graft 2 sets of 10 sts.


Step: 130

Thumb: Pick up and knit 2 sts at base of thumb. K12 from safety pin. Divide these 14 sts onto 3 needles.


Step: 131

Knit 14 rnds.


Step: 132

Next rnd: [(K1. K2tog) twice. K1] twice. 10 sts Next rnd: (K2tog) 5 times. 5 sts.


Step: 133

Break yarn leaving a long end. Thread end through rem 5 sts. Draw up and fasten securely.***


Step: 134

LEFT MITTEN


Step: 135

Work from ** to ** as given for Right Mitten.


Step: 136

Change to larger needles and proceed as follows:


Step: 137

1st rnd: K25. (M1. K1) 4 times. Knit to end of rnd. 40 sts.


Step: 138

2nd rnd: K23. P2. Work 1st row in Panel Pat E. P2. Knit to end of rnd.


Step: 139

Panel Pat E is now in position.


Step: 140

Work in pat for 7 rnds more.


Step: 141

Shape thumb gusset: 1st rnd: Pat 17 sts. Inc 1 st in each of next 2 sts. Knit to end of rnd.


Step: 142

2nd and alt rnds: Work even in pat.


Step: 143

3rd rnd: Pat 17 sts. Inc 1 st in next st. K2. Inc 1 st in next st. Knit to end of rnd.


Step: 144

5th rnd: Pat 17 sts. Inc 1 st in next st. K4. Inc 1 st in next st. Knit to end of rnd.


Step: 145

Cont in same manner, inc 2 sts on every following alt rnd to 50 sts.


Step: 146

Next rnd: Pat 17 sts. Cast on 2 sts. Slip next 12 sts onto safety pin (thumb opening). Knit to end of rnd.


Step: 147

Work from *** to *** as given for Right Mitten.


Step: 148

Sew 1 button on each Mitten to correspond to buttonhole on Arm warmers.


Tips

Refer to photo to complete project.

Follow manufacturer's directions for all products used.