
Intermediate
You're somewhat experienced with the skills necessary to complete this project, but you haven't mastered all the elements, yet.
Step 1 |
Project Note: The number of Skeins needed to complete this project is 4 - Bernat® Baby Blanket™ Yarn – Violet Posie MEASUREMENTS: Approx. 38" x 42" [96.5 x 106.5 cm]. GAUGE: 8 sts and 13 rows = 4" [10 cm] in stocking stitch. INSTRUCTIONS: Cast on 81 sts. Do not join. Working back and forth across needle in rows, proceed as follows: Knit 6 rows (garter st), noting 1st row is WS. Next Row: (WS). K8. *M1. K5. Rep from * to last 3 sts. K3. 95 sts. Proceed in Cable Pat as follows: 1st Row: (RS). *K8. P1. K4. Rep from * to last 4 sts. K4. 2nd and Alt Rows: *K4. P4. K1. P4. Rep from * to last 4 sts. K4. 3rd Row: *K4. C4B. P1. C4F. Rep from * to last 4 sts. K4. 5th and 7th Rows: As 1st row. 8th Row: As 2nd row. These 8 rows form Cable Pat. Cont in pat until work from beg measures approx 41" [104 cm], ending on a WS row. Next Row: (RS). K8. *K2tog. K4. Rep from * to last 3 sts. K3. 81 sts. Knit 6 rows (garter st). Cast off knitwise (WS). ABBREVIATIONS: Alt = Alternating Approx = Approximately Beg = Begin(ning) C4B = Slip next 2 stitches onto cable needle and leave at back of work. K2, then K2 from cable needle C4F = Slip next 2 stitches onto cable needle and leave at front of work. K2, then K2 from cable needle Cont = Continue K = Knit K2tog = Knit next 2 stitches together M1 = Make 1 stitch by picking up horizontal loop lying before next stitch and knitting into back of loop. Pat = Pattern P = Purl Rep = Repeat RS = Right Side St(s) = Stitch(es) WS = Wrong Side Share your project photos with #MakeItWithMichaels |
Supplies
Materials
Materials
https://www.michaels.com/bernat-baby-blanket-cable-cozy-knit-blanket/B_84858.html
Tools
Tools
https://www.michaels.com/bernat-baby-blanket-yarn-big-ball/10542063.html
You’ll Also Need
Instructions
Step 1 |
Project Note: The number of Skeins needed to complete this project is 4 - Bernat® Baby Blanket™ Yarn – Violet Posie MEASUREMENTS: Approx. 38" x 42" [96.5 x 106.5 cm]. GAUGE: 8 sts and 13 rows = 4" [10 cm] in stocking stitch. INSTRUCTIONS: Cast on 81 sts. Do not join. Working back and forth across needle in rows, proceed as follows: Knit 6 rows (garter st), noting 1st row is WS. Next Row: (WS). K8. *M1. K5. Rep from * to last 3 sts. K3. 95 sts. Proceed in Cable Pat as follows: 1st Row: (RS). *K8. P1. K4. Rep from * to last 4 sts. K4. 2nd and Alt Rows: *K4. P4. K1. P4. Rep from * to last 4 sts. K4. 3rd Row: *K4. C4B. P1. C4F. Rep from * to last 4 sts. K4. 5th and 7th Rows: As 1st row. 8th Row: As 2nd row. These 8 rows form Cable Pat. Cont in pat until work from beg measures approx 41" [104 cm], ending on a WS row. Next Row: (RS). K8. *K2tog. K4. Rep from * to last 3 sts. K3. 81 sts. Knit 6 rows (garter st). Cast off knitwise (WS). ABBREVIATIONS: Alt = Alternating Approx = Approximately Beg = Begin(ning) C4B = Slip next 2 stitches onto cable needle and leave at back of work. K2, then K2 from cable needle C4F = Slip next 2 stitches onto cable needle and leave at front of work. K2, then K2 from cable needle Cont = Continue K = Knit K2tog = Knit next 2 stitches together M1 = Make 1 stitch by picking up horizontal loop lying before next stitch and knitting into back of loop. Pat = Pattern P = Purl Rep = Repeat RS = Right Side St(s) = Stitch(es) WS = Wrong Side Share your project photos with #MakeItWithMichaels |