
Intermediate
You're somewhat experienced with the skills necessary to complete this project, but you haven't mastered all the elements, yet.
Step 1 |
SIZES: Adult Average FINISHED MEASUREMENTS: Hand circumference: 7" Length: 9½" GAUGE: 10.5 sts x 16 rows = 4" over Stockinette Stitch; save time, check your gauge. Project Note: The number of Skeins needed to complete this project is 2-Loops & Threads® Charisma™ Yarn - Red and 1-Loops & Threads® Charisma™ Yarn - Taupe |
Step 2 |
RIDGE PATTERN: Row 1 (WS): With A, knit. Row 2: Purl. Row 3: Knit.Change to B. Row 4: Knit. Row 5: Purl.Change to A. Row 6: Knit. Rep Rows 1-6 for pattern. PATTERN NOTES:The hat and mitts are knit flat, them seamed. |
Step 3 |
MITTS Cuff: With A, CO 22 sts.Work Rows 1-6 of Ridge Pattern once, then work Rows 1-5 of Pattern once more.Next Row (Row 6 of Pattern): * K5, k2tog; rep from * to last st, k1 – 19 sts. Work Rows 1-6 of Ridge Pattern, then work Rows 1-3 of Pattern once more. Cut B. |
Step 4 |
Thumb Gusset: Row 1 (RS): Knit. Row 2 and all WS rows: Purl. Row 3: K9, place marker, M1R, k1, M1L, place marker, knit to end – 21 sts. Row 5: Knit to marker, slip marker, M1R, knit to marker, M1L, slip marker, knit to end – 23 sts. Row 7: Rep Row 5 – 25 sts. Row 9: Knit. Row 11: Rep Row 5 – 27 sts. Row 13: K9, remove marker, slip next st to right hand needle, slip next 7 sts to waste yarn for holding, move slipped st back to left hand needle and knit it together with next st, remove marker, knit to end – 19 sts. Rows 15, 17, 19 and 21: Knit. Row 22 (WS): Knit. Row 23: Purl. Row 24: Knit. Bind off loosely. |
Step 5 |
Thumb: Slip thumb gusset sts from waste yarn back to needle. Join yarn to work a RS row. Row 1 (RS): K1, M1L, knit to last st, M1R, k1 – 9 sts. Row 2 (WS): Knit. Row 3: Purl. Row 4: Knit. Bind off loosely. FINISHING Use tail from thumb to sew thumb seam and close up any gaps at base of thumb.Sew seam at side of mitt. |
Step 6 |
Project Note: Click here for materials and instructions to make the matching hat. ABBREVIATIONS: Color A = Red Color B = Taupe CO = Cast On K = Knit K2tog = Knit 2 Stitches Together M1L = Make 1 Left-leaning M1R = Make 1 Right-leaning RS = Right Side Rep = Repeat St(s) = Stitch(es) WS = Wrong Side Share your project photos with #MakeItWithMichaels |
Supplies
Materials
Materials
https://www.michaels.com/loops-and-threads-charisma-concertina-knit-mitts/B_81397.html
Tools
Tools
https://www.michaels.com/charisma-yarn-by-loops-and-threads/10133751.html
You’ll Also Need
Instructions
Step 1 |
SIZES: Adult Average FINISHED MEASUREMENTS: Hand circumference: 7" Length: 9½" GAUGE: 10.5 sts x 16 rows = 4" over Stockinette Stitch; save time, check your gauge. Project Note: The number of Skeins needed to complete this project is 2-Loops & Threads® Charisma™ Yarn - Red and 1-Loops & Threads® Charisma™ Yarn - Taupe |
Step 2 |
RIDGE PATTERN: Row 1 (WS): With A, knit. Row 2: Purl. Row 3: Knit.Change to B. Row 4: Knit. Row 5: Purl.Change to A. Row 6: Knit. Rep Rows 1-6 for pattern. PATTERN NOTES:The hat and mitts are knit flat, them seamed. |
Step 3 |
MITTS Cuff: With A, CO 22 sts.Work Rows 1-6 of Ridge Pattern once, then work Rows 1-5 of Pattern once more.Next Row (Row 6 of Pattern): * K5, k2tog; rep from * to last st, k1 – 19 sts. Work Rows 1-6 of Ridge Pattern, then work Rows 1-3 of Pattern once more. Cut B. |
Step 4 |
Thumb Gusset: Row 1 (RS): Knit. Row 2 and all WS rows: Purl. Row 3: K9, place marker, M1R, k1, M1L, place marker, knit to end – 21 sts. Row 5: Knit to marker, slip marker, M1R, knit to marker, M1L, slip marker, knit to end – 23 sts. Row 7: Rep Row 5 – 25 sts. Row 9: Knit. Row 11: Rep Row 5 – 27 sts. Row 13: K9, remove marker, slip next st to right hand needle, slip next 7 sts to waste yarn for holding, move slipped st back to left hand needle and knit it together with next st, remove marker, knit to end – 19 sts. Rows 15, 17, 19 and 21: Knit. Row 22 (WS): Knit. Row 23: Purl. Row 24: Knit. Bind off loosely. |
Step 5 |
Thumb: Slip thumb gusset sts from waste yarn back to needle. Join yarn to work a RS row. Row 1 (RS): K1, M1L, knit to last st, M1R, k1 – 9 sts. Row 2 (WS): Knit. Row 3: Purl. Row 4: Knit. Bind off loosely. FINISHING Use tail from thumb to sew thumb seam and close up any gaps at base of thumb.Sew seam at side of mitt. |
Step 6 |
Project Note: Click here for materials and instructions to make the matching hat. ABBREVIATIONS: Color A = Red Color B = Taupe CO = Cast On K = Knit K2tog = Knit 2 Stitches Together M1L = Make 1 Left-leaning M1R = Make 1 Right-leaning RS = Right Side Rep = Repeat St(s) = Stitch(es) WS = Wrong Side Share your project photos with #MakeItWithMichaels |